Assessment basis

Clear scope, conservative conclusions

LetClear supports England only and evaluates recorded facts against supported, versioned checks. It does not determine legal validity and deliberately withholds an estimate where the route depends on facts the engine does not model.

Coverage register reviewed: 25 September 2026.

This register describes supported England checks, including historical England rules. Scotland, Wales and Northern Ireland are outside active support. Existing records remain available read-only, without new assessments, reminders or source monitoring for those jurisdictions. It is not a live source-health report or legal sign-off. Your assessment applies the relevant effective dates and reports missing facts and unresolved source reviews.

England

Rule pack: 2026-09-21.england.9

Modelled checks

Limits and checks you must arrange separately

  • Council licensing designations and licence conditions require an address-specific review. LetClear records that review; it does not determine applicability.
  • Rent increases, rent repayment orders, planning, building control and the full range of housing hazards are outside the modelled checks.
  • Possession support does not establish ground eligibility, notice validity, service or entitlement to possession. England Form 3A generation remains disabled because notice generation is outside the current product scope.

Notice calculator boundaries

  • rent arrearsCautious estimate

    Live England output is a cautious broad Section 8 estimate only; it does not validate final ground eligibility, service method, prior notices, protected periods beyond the modelled Ground 1 / 1A timing edge case, or drafting.

    Official source
  • antisocial behaviourCautious estimate

    Live England output is a cautious broad Section 8 estimate only; it does not validate final ground eligibility, service method, prior notices, protected periods beyond the modelled Ground 1 / 1A timing edge case, or drafting.

    Official source
  • selling or moving inCautious estimate

    Live England output is a cautious broad Section 8 estimate only; it does not validate final ground eligibility, service method, prior notices, protected periods beyond the modelled Ground 1 / 1A timing edge case, or drafting.

    Official source
  • breach of tenancyCautious estimate

    Live England output is a cautious broad Section 8 estimate only; it does not validate final ground eligibility, service method, prior notices, protected periods beyond the modelled Ground 1 / 1A timing edge case, or drafting.

    Official source
  • otherNot modelled

    England route is not modelled for a notice-period estimate because the facts must first be mapped to the correct statutory ground.